Having recently made a number of improvements to my CH system I am now considering converting it to a fully pumped system with a motorised valve. It is presenty pumped CH, gravity water feed with primatic cylinder. Consequently there are 4 pipes in addition to gas going from the boiler.
Could anyone confirm in point form the steps I need to take so that I can check I haven't missed any out.
Thank you
Could anyone confirm in point form the steps I need to take so that I can check I haven't missed any out.
Thank you