- Joined
- 11 Dec 2007
- Messages
- 400
- Reaction score
- 2
- Country
Inhibitor:
Story short, was able to get the plumber to put in some inhibitor today (yes i know it sounds like a task - story short)...
When i got home i noticed he'd left the inhibitor bottle by the boiler & i'm just wondering if it's enough.
It's a 500ml bottle stamped up as 4Trade & says minimum dosage rate is 500ml per 100litre system capacity.
Now i've no idea how much juice is in my system. I have upstairs - 1 towel rad, 2 single panel single convector rads at approx 1.7mtr-x-0.6mtr, 1 rad approx 750mm-x-600mm single panel single convector.
Downstairs is 1x 1800x600mm double-double, 2x 700-x-600 double-double, 2x 900-x-600mm double-double.
10mm pipe work feeding the rads.
Just wondering if it's enough or not.
Lockshield valve cap:
I've had a fair amount of work done & the rads needed to come off. Somehow the lockshield cap has gone missing to the big rad in the living room.
The TRV is stamped up as danfoss & i'm guessing they come in pairs so the other end will be a danfoss valve.
The bit that you'll have to tighten/open with pliers is threaded inside for a screw if this helps.
If you need photos then i can sort this out tomorrow but is there any chance anyone would be able to link up to what i'd need here?
Thanks.
Story short, was able to get the plumber to put in some inhibitor today (yes i know it sounds like a task - story short)...
When i got home i noticed he'd left the inhibitor bottle by the boiler & i'm just wondering if it's enough.
It's a 500ml bottle stamped up as 4Trade & says minimum dosage rate is 500ml per 100litre system capacity.
Now i've no idea how much juice is in my system. I have upstairs - 1 towel rad, 2 single panel single convector rads at approx 1.7mtr-x-0.6mtr, 1 rad approx 750mm-x-600mm single panel single convector.
Downstairs is 1x 1800x600mm double-double, 2x 700-x-600 double-double, 2x 900-x-600mm double-double.
10mm pipe work feeding the rads.
Just wondering if it's enough or not.
Lockshield valve cap:
I've had a fair amount of work done & the rads needed to come off. Somehow the lockshield cap has gone missing to the big rad in the living room.
The TRV is stamped up as danfoss & i'm guessing they come in pairs so the other end will be a danfoss valve.
The bit that you'll have to tighten/open with pliers is threaded inside for a screw if this helps.
If you need photos then i can sort this out tomorrow but is there any chance anyone would be able to link up to what i'd need here?
Thanks.