Hello All. Can anyone please advise. I'm hoping to board the loft to use for light storage. When I went up I noticed the state of our insulation. It's really tatty and torn wool type insulation, and is only 10cm deep in some places. In other areas, it's non-existent. I obviously need to increase level of insulation to the recommended 27cm. The joists are 2 x 4 so can only put an initial layer of 10cm (I'll remove all old insulation).
I considered laying the Knauf Supadeck but I'm not a footballer!!!
As such, is it safe for me to cross batten with 2 x 7 or 2 x 8 beams (from B&Q or lumberyard) thus giving me the additional 17.5cm space to increase insulation and also lay down loft boards? Alternatively, should I cut out 2 x 4" blocks and attach these to the joists, THEN lay 2 x 4 beams on these blocks? If either one of these methods is OK, what's the best way to attach the beams to the joists? Can you get 9" or 10" screws? Should I use 90 degree angle brackets? Also what's the best way to safeguard the electrical wiring?
In addition, we've recently had GCH + combi installed and the pipes had to go through the loft space (the pipes are well insulated). Is it safe to insulate around these too? I'm considering boxing these using plywood as there are pipe joins and valves, to allow access should anything go wrong. Any advice? Can I also remove the cold water tank and the raised base it was on? All pipes to the tank have been disconnected and it's completely drained.
I'm a capable DIY'er so long as instructions are easy to follow. Pictures help too!! Any advice is welcome and greatly appreciated.
I considered laying the Knauf Supadeck but I'm not a footballer!!!
As such, is it safe for me to cross batten with 2 x 7 or 2 x 8 beams (from B&Q or lumberyard) thus giving me the additional 17.5cm space to increase insulation and also lay down loft boards? Alternatively, should I cut out 2 x 4" blocks and attach these to the joists, THEN lay 2 x 4 beams on these blocks? If either one of these methods is OK, what's the best way to attach the beams to the joists? Can you get 9" or 10" screws? Should I use 90 degree angle brackets? Also what's the best way to safeguard the electrical wiring?
In addition, we've recently had GCH + combi installed and the pipes had to go through the loft space (the pipes are well insulated). Is it safe to insulate around these too? I'm considering boxing these using plywood as there are pipe joins and valves, to allow access should anything go wrong. Any advice? Can I also remove the cold water tank and the raised base it was on? All pipes to the tank have been disconnected and it's completely drained.
I'm a capable DIY'er so long as instructions are easy to follow. Pictures help too!! Any advice is welcome and greatly appreciated.