We are having to cut out channels in our existing kitchen floor slab for a new kitchen island.
I will need to place an electric feed for the sockets; cold feed, hot feed and a gas pipe. I will also have to re-do some drainage so will dig out for that and re-cover.
So I guess I'm keen on tips/suggestions with regards to
1. depth of channel(s)
2. Plumbing: can I bury pushfit/speedfit type plastic pipes/connectors in concrete for hot/cold - do they need to be lagged/insulated?
3. Gas: The plumber will place that pipe and connect etc. Any advice?
4. Electrics: What type of ducting should I use, if any? It's just one ring main.
5. Screed: What mix/material should I use?
6. DPM - is this required? Not sure if one is there as it's an old extension.
I will need to place an electric feed for the sockets; cold feed, hot feed and a gas pipe. I will also have to re-do some drainage so will dig out for that and re-cover.
So I guess I'm keen on tips/suggestions with regards to
1. depth of channel(s)
2. Plumbing: can I bury pushfit/speedfit type plastic pipes/connectors in concrete for hot/cold - do they need to be lagged/insulated?
3. Gas: The plumber will place that pipe and connect etc. Any advice?
4. Electrics: What type of ducting should I use, if any? It's just one ring main.
5. Screed: What mix/material should I use?
6. DPM - is this required? Not sure if one is there as it's an old extension.