Hi all, I'm new on here but wanna pick some brains. I've recently finished a job I was doing boarding out a loft inc fitting light, and erecting a plastic shed in a rear garden and also cutting down some large branches which were over hanging the garden.
I quoted and did two quotes for the shed, one was for fitting shed on slabs and the other was just for fitting on a level area soiled area in the garden, (she requested this quote).
Anyways she went for the cheaper quote, and it worked out to 1 and half days work. I started in the garden with the branches and then moved onto levelling the soil, however the ground was really uneven and ideally a slab base was required, so I left that and jumped on the loft stuff which I finished by the end of the day.
She got home from work and I told her about my issues with laying it straight onto the soil and that the shed wouldn't sit right, however she insisted that was how she wanted it. I siad was wasn't happy about doing it that way, but if she was happy then so be it.
Right, so turned up the next day to finish off and she asked me when I was going to finish off the loft boarding. I told her I'd finished and she said she thought I was doing 6m x 10m!! I said that I'd only quoted for 6ft x 10ft, (this is when alarm bells started ringing), she disagreed and thought I was trying to diddle her at which point I told her she could check all my receipts against what I'd quoted, this seemed to shut her up although she wasn't happy. She then asked me to do some more boaring in the loft and she would pay the extra for materials and labour.
So I went out got the materials, did more boarding, and then started on the shed, this was around 2pm. I managed to level off the site as best as I could and erect all the walls and doors, but ran out of light to finish off the shed. I told her I could come back Saturday morning to finish off the shed, but she said her son could do that and not to worry.
I sent my invoice and she sent me a cheque but omitted £90 as I hadn't completed the works as originally quoted! I asked her for extra and she told me if I wanted it I'd have to take her to court!!!
This pi$$es me off big time and I wanna know what I can do, I've been advised to forget it and don't even bother going through the courts as its pointless and can cost.
Some advice please Thanks.
Jon
I quoted and did two quotes for the shed, one was for fitting shed on slabs and the other was just for fitting on a level area soiled area in the garden, (she requested this quote).
Anyways she went for the cheaper quote, and it worked out to 1 and half days work. I started in the garden with the branches and then moved onto levelling the soil, however the ground was really uneven and ideally a slab base was required, so I left that and jumped on the loft stuff which I finished by the end of the day.
She got home from work and I told her about my issues with laying it straight onto the soil and that the shed wouldn't sit right, however she insisted that was how she wanted it. I siad was wasn't happy about doing it that way, but if she was happy then so be it.
Right, so turned up the next day to finish off and she asked me when I was going to finish off the loft boarding. I told her I'd finished and she said she thought I was doing 6m x 10m!! I said that I'd only quoted for 6ft x 10ft, (this is when alarm bells started ringing), she disagreed and thought I was trying to diddle her at which point I told her she could check all my receipts against what I'd quoted, this seemed to shut her up although she wasn't happy. She then asked me to do some more boaring in the loft and she would pay the extra for materials and labour.
So I went out got the materials, did more boarding, and then started on the shed, this was around 2pm. I managed to level off the site as best as I could and erect all the walls and doors, but ran out of light to finish off the shed. I told her I could come back Saturday morning to finish off the shed, but she said her son could do that and not to worry.
I sent my invoice and she sent me a cheque but omitted £90 as I hadn't completed the works as originally quoted! I asked her for extra and she told me if I wanted it I'd have to take her to court!!!
This pi$$es me off big time and I wanna know what I can do, I've been advised to forget it and don't even bother going through the courts as its pointless and can cost.
Some advice please Thanks.
Jon