damp proof membrane

Joined
18 Mar 2011
Messages
283
Reaction score
4
Location
Berkshire
Country
United Kingdom
If i have laid a concrete floor base with 1200 gauge dpm under, do i still require another dpm sheet over the concrete before insulation and screed, or is the one already in place enough?
 
Sponsored Links
You need a polythene sheet over the insulation. it doesn't need to be a proper dpm. It's just to stop the screed losing too much moisture into/ between the insulation.

You could tape the joints, but a) some BCOs prefer polythene sheet, and b) polythene sheet is easier, quicker and more secure.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top