Please could someone answer some questions on installing a flat roof, I've been told by building control I need 120mm insulation on top furring strips then board 18mm OSB as I'm having GRP.
I also know I need a vapour barrier is this under the insulation and on to the furring strips ?
The other question is have I got to board out on top furring strips then insulation then board out on top then insulation then GRP roof covering?
I also know I need a vapour barrier is this under the insulation and on to the furring strips ?
The other question is have I got to board out on top furring strips then insulation then board out on top then insulation then GRP roof covering?