Hello. Just wondered if anyone on here has much experience with diggers. Im thinking of hiring a 3 ton one. Mainly as theres 500mmm thick concrete to break and I assume a bigger digger does it quicker with a breaker fitted? And also theres about 80 m3 of soil to be dug.