Im thinking / dreaming about building an underground bunker man cave in my garden fairly big around 25 m2 3 meters deep.
It would be 4 meters from the house and 2 meters away from all the fences. So wouldn't need planning ect.
The only thing I could get into my garden is a micro digger and micro dumper with a skip on the drive.
Would it be possible to dig this kind of hole with these sized diggers? and does anyone know ruffly how long it would take.. Assuming the ground isnt full of rocks ect.
I think the depth of the diggers reach is about 2 meters so i guess you would have to dig an excess ramp in ect.
It would be 4 meters from the house and 2 meters away from all the fences. So wouldn't need planning ect.
The only thing I could get into my garden is a micro digger and micro dumper with a skip on the drive.
Would it be possible to dig this kind of hole with these sized diggers? and does anyone know ruffly how long it would take.. Assuming the ground isnt full of rocks ect.
I think the depth of the diggers reach is about 2 meters so i guess you would have to dig an excess ramp in ect.