Currently in the process of a full refurb.
The very old kitchen extension had a solid floor with no membrane/insulation and the screed was cracked and blown in a few places where it had been hacked around for pipework previously.
I have broken up and dug down through the screed followed by red pavers, and finally soil, to approx. 200mm
I plan to spread and wack a small amount of type 1 to properly level it, followed by blinding of building sand, membrane, 100mm celotex and finally a 50/60mm screed. There will also be some pipework laid on the insulation before screeding.
Does all of the above sound ok?
Thanks in adance
The very old kitchen extension had a solid floor with no membrane/insulation and the screed was cracked and blown in a few places where it had been hacked around for pipework previously.
I have broken up and dug down through the screed followed by red pavers, and finally soil, to approx. 200mm
I plan to spread and wack a small amount of type 1 to properly level it, followed by blinding of building sand, membrane, 100mm celotex and finally a 50/60mm screed. There will also be some pipework laid on the insulation before screeding.
Does all of the above sound ok?
Thanks in adance