Here's an interesting one.
Client wants me to supply 2 x 3kw electrical loads to run his Ariston STD210 cylinder.
Cylinder is not part of the CH system and was chosen by a 3rd party as a method of getting HW in to the loft shower and bathroom.
Now I could put 2 x event timers across the power supply for control, but I'm not sure of a few things.
* Does this unit use both 3kw heaters simultaneously
* Is there a better method of auto control than 2 x timers
Have looked on Ariston web site, but 95% of the connectivity drawings reference boiler based water heating with the cylinder as a storage vessel. As mentioned the unit will be used as an immersion heater without CH.
Thanks for any interest / help
Client wants me to supply 2 x 3kw electrical loads to run his Ariston STD210 cylinder.
Cylinder is not part of the CH system and was chosen by a 3rd party as a method of getting HW in to the loft shower and bathroom.
Now I could put 2 x event timers across the power supply for control, but I'm not sure of a few things.
* Does this unit use both 3kw heaters simultaneously
* Is there a better method of auto control than 2 x timers
Have looked on Ariston web site, but 95% of the connectivity drawings reference boiler based water heating with the cylinder as a storage vessel. As mentioned the unit will be used as an immersion heater without CH.
Thanks for any interest / help