So I've finished the pir insulation layers for my new solid floors. I've filled and foamed any gaps between joins between the pir sheets and against the walls. But now wondering if I should tape all joins before I put down my 500 gauge sheet to prevent the flow screed getting under? I will be laying ufh pipework on top of the slip layer which I believe is the correct order. The slip layer will cover the whole layer of insulation and flow up and over the upstands, hopefully tape it to the wall while screed is installed then later cut it back to floor level along with the upstands and dpm
I've not found anything definitive and my building control guy hasn't been specific other than referring to the installer for thr ufh, which is us as we're doing it all
Thanks
The order was Type1, Blinding sand, concrete, pir
I've not found anything definitive and my building control guy hasn't been specific other than referring to the installer for thr ufh, which is us as we're doing it all
Thanks