Double pole isolation switch at meter

Joined
3 Mar 2005
Messages
800
Reaction score
61
Location
Surrey
Country
United Kingdom
I currently have two consumer units fed from the meter via a DP tails connection block (100A).
Can you get a DP 100A isolation switch that can replace the connection block :- i.e it will take 2L and 2N tails on the output side ? I believe some companies specify an isolation switch these days.
 
Sponsored Links
No you can't.

You could have a switch installed between the meter and the henley block, but I don't know why you'd want to.
 
Seems to me it's better to have an isolation switch than to call out the company to remove the company fuse when you need to do (or have done) work on the CU.

In Spain, the consumr unit has a separate "company" section with an isolation switch and company fuse.
 
Sponsored Links
How often do you need to work on your consumer side meter tails?

It's just four unnecessary connections just waiting to fail as far as I'm concerned.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top