This was the downstairs loo when we bought the house with, bizarrely, the WC soil pipe routed out forwards then down:
This was the stud box I built to hang the pan on, the soil pipe now going vertically downwards:
Laufen Compact Pro pan, very neat and you can keep the floor nice and clean:
...and a Laufen Casa home urinal with aiming fly for the boys:
This was the family bathroom. Seventies orange with scalloped sink and Victoriana taps, Artex ceiling, one 60w bulb, cork floor tiles, smelly WC, rad plumbed to HW circuit....
Now completely stripped out, replastered, rewired, halogen lighting, with P shaped bath/shower, Crosswater taps etc., follow me handset on bath, Mermaid shower boards in gloss white, heated mirror, towel rail electric and plumbed to the CH circuit, another Laufen Compact pan bolted to the frame bolted to the wall with no contact with the floor so as to reduce sound transmission to the kitchen below. New window. WC moved to the RH corner. Cistern box finished with a slab of marble. Took me about 2 weeks, I did everything except the plastering and the electrics. Final cost: £5400.
New door to replace the orange varnished "Victorian" 6 panel door and I had to fit a new frame as the old one was so badly crooked. Door got 3 coats of Dulux Trade varnish in satin, a nice low-key finish that doesn't show blemishes or brushmarks:
(BTW the door doesn't touch the towel rail, it misses by a couple of cms. The wall is foreshortened in the picture.)
This was the stud box I built to hang the pan on, the soil pipe now going vertically downwards:
Laufen Compact Pro pan, very neat and you can keep the floor nice and clean:
...and a Laufen Casa home urinal with aiming fly for the boys:
This was the family bathroom. Seventies orange with scalloped sink and Victoriana taps, Artex ceiling, one 60w bulb, cork floor tiles, smelly WC, rad plumbed to HW circuit....
Now completely stripped out, replastered, rewired, halogen lighting, with P shaped bath/shower, Crosswater taps etc., follow me handset on bath, Mermaid shower boards in gloss white, heated mirror, towel rail electric and plumbed to the CH circuit, another Laufen Compact pan bolted to the frame bolted to the wall with no contact with the floor so as to reduce sound transmission to the kitchen below. New window. WC moved to the RH corner. Cistern box finished with a slab of marble. Took me about 2 weeks, I did everything except the plastering and the electrics. Final cost: £5400.
New door to replace the orange varnished "Victorian" 6 panel door and I had to fit a new frame as the old one was so badly crooked. Door got 3 coats of Dulux Trade varnish in satin, a nice low-key finish that doesn't show blemishes or brushmarks:
(BTW the door doesn't touch the towel rail, it misses by a couple of cms. The wall is foreshortened in the picture.)