My son in law and I have started to build blockwork for a replacement and extended porch..
there is DPC under old concrete base, but we laid extended base without yet putting DPC. There is a 2" leeway for putting DPC sheet in with scree on top up to level of door step. We are however putting large tiles with waterproof adhesive down - will this be sufficient or can i put tiles down on top of membrane.? as there wont be enough height for both scree and tiles.
the new concrete base was laid on top of concrete path already in existance, not bare ground.
also we forgot to put DPC in blockwork till after 3rd course! How much risk is there that damp could rise to damage internal plaster and ext render in the future.? Is there anything i can treat heavy duty, dense concrete blocks weve used (not breeze blocks)
there will be 4' french doors at either end and sloping roof with cedar shingles.
cheers for any advice!
there is DPC under old concrete base, but we laid extended base without yet putting DPC. There is a 2" leeway for putting DPC sheet in with scree on top up to level of door step. We are however putting large tiles with waterproof adhesive down - will this be sufficient or can i put tiles down on top of membrane.? as there wont be enough height for both scree and tiles.
the new concrete base was laid on top of concrete path already in existance, not bare ground.
also we forgot to put DPC in blockwork till after 3rd course! How much risk is there that damp could rise to damage internal plaster and ext render in the future.? Is there anything i can treat heavy duty, dense concrete blocks weve used (not breeze blocks)
there will be 4' french doors at either end and sloping roof with cedar shingles.
cheers for any advice!