I have built a 2 course single width wall on top of an existing concrete plinth. I intend to lap DPM over this and raise inside area floor with about 75mm of concrete (to existing flooring). Then put DPC on top of wall before screwing down a timber frame (treated) to make a cladded wall. Do I need to bed the DPC in with mortar above or below DPC or not at all?