I have a Glow worm Ultracom 30cx combi boiler feeding a sealed heating system.
I plan to replace a couple of lock shield valves along with moving a radiator.
Is it safe to close the heating feed and return at the boiler to allow me to work on the heating circuit while still having hot water?
The manual states the boiler is fitted with an automatic bypass and expansion vessel.
I would turn the heating off at the boiler but leave the hot water as normal.
I plan to replace a couple of lock shield valves along with moving a radiator.
Is it safe to close the heating feed and return at the boiler to allow me to work on the heating circuit while still having hot water?
The manual states the boiler is fitted with an automatic bypass and expansion vessel.
I would turn the heating off at the boiler but leave the hot water as normal.