R
roberta1000
I'm having an extension and conservatory built and am going to put a patio around it of about 40 square metres. Because of the levels the patio will have to be a bit of a low point in the garden to stay far enough below the dpc. Is it permissible to build a connection into the house drains when the groundworks are being done and drain the patio into that?