The inspection chamber nearest the sewer has been blocked twice recently.It is about 6ft deep and has two openings at the bottom. The higher of the two I am able to rod but the lower one which is level with the drain I cannot.Can anyone explain please the function of both these eyelets.My drain just serves our house which was built in 1955.