will be installing a kitchen and need to drill a new 40mm waste pipe hole through the 9" solid wall + insulated plasterboard
Is it best to do this before installing sink waste pipework, or best to install the sink traps etc and mark an exit hole once the sink waste is all linked up?
ie. drill the hole at the very end of kitchen fit. I will be fully remoing the back panel for the sink unit so i'll be straight onto the plasterboard from under the sink
Is it best to do this before installing sink waste pipework, or best to install the sink traps etc and mark an exit hole once the sink waste is all linked up?
ie. drill the hole at the very end of kitchen fit. I will be fully remoing the back panel for the sink unit so i'll be straight onto the plasterboard from under the sink