drilling tiles

Joined
4 Aug 2008
Messages
208
Reaction score
3
Location
London
Country
United Kingdom
how long should you wait after tiling before you can drill holes through the tiles, i need to hang rads, fittings etc up?
 
Sponsored Links
Until the adhesive has gone off, of course.

Which adhesive, how thick a bed, what type of backing, what type of tile?
 
Depends on the adhesive and the substrate. If tiling onto most general substrates using a pre-mixed adhesive, then you should wait 24 hours. If you have use pre-mixed adhesive over a previously tiled wall or over a tanked wall, then you should wait 72 hours.
If you have used a general powdered adhesive, then generally 12 hours will suffice or 3 hrs for a rapid-setting adhesive.
These are the same times that you should wait before grouting also.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top