Been doing my driveway over the past week and for my first go I am doing ok but got abit confused with the depth. I dug down 200mm as I thought you need 100 of MOT type when compacted not 100mm then 75mm cvompacted. I also got told you needed 50mm sand or mortor bed not 25mm then 50mm flag. Is this information correct as I got 3 tonne dropped off but will need more type 1 to raise it more if these hights are correct. It is a 25m2 driveway I am doing ?
If they are not right and I already have enough I am assumign I can just drop the string line a bit aas I have put my kerbs in and its running on a slope. ?
Thanks