hello,
Should I dry line a new breeze block wall (about 75m2 in total) and then skim, or is it better to do a scratch coat then skim.
The height of the room is 2.7m. 2.4m plasterboard is about £6 per sheet, while 2.7m is about £12 per sheet, should I use the 2.4m and then add a 25cm strip, if so top or bottom. Or should I pay the extra for the 2.7m
Plasterboard thickness, i'm assuming walls are 12.5, is the the same for ceilings with bare joists.
many thanks, apologies if the question are a little dumb.
Should I dry line a new breeze block wall (about 75m2 in total) and then skim, or is it better to do a scratch coat then skim.
The height of the room is 2.7m. 2.4m plasterboard is about £6 per sheet, while 2.7m is about £12 per sheet, should I use the 2.4m and then add a 25cm strip, if so top or bottom. Or should I pay the extra for the 2.7m
Plasterboard thickness, i'm assuming walls are 12.5, is the the same for ceilings with bare joists.
many thanks, apologies if the question are a little dumb.