Hi ive just replaced two lead valleys with GRP valleys, where an extension pitched roof meets the main house roof. I am intending on using a dry ridge system but im not sure how to fix the ridge tile that meets the top of the GRP valleys (where they meet and have lead dressed over the join).
Hope thats descriptive enough, any help would be awesome thanks
Hope thats descriptive enough, any help would be awesome thanks