I have just poured my floor slab in my new conservatory.
Does anyone have any idea how long it will take to dry sufficiently before I lay my new laminate floor?
It is approximatley 150mm thick and 2500mm by 4800mm.Is there a general rule of thumb or shall i leave it about 3 weeks or so?
I will be laying an underlay but this is not a damp proof membrane, just a 3mm thick layer of foam as I didn't really want to lay the laminate straight on to the concrete.
Any ides on drying time??
Thanks