Hi everyone,
I’m currently getting my whole house plastered after a full rewire and was wondering how it’s best to dry out the plaster.
The house currently doesn’t have the central heating working and as you guys may know it’s 4/5 degrees outside in daylight and lower at night.
I’ve read online some people saying to let it cure on its own, others saying dehumidifier, others saying convection heater, so I’m a little all over the place at the moment.
I’m in no rush to move in so not fussed about speeding up the process. I want to know the best way to avoid cracks.
Do I just leave windows open over night and let it cure on its own?
Do I put in a couple of heaters?
Will the really low temperatures cause an issue? Or does the temperature not really cause a problem as long as it can dry out naturally?
All help is much appreciated .
Thanks all!
I’m currently getting my whole house plastered after a full rewire and was wondering how it’s best to dry out the plaster.
The house currently doesn’t have the central heating working and as you guys may know it’s 4/5 degrees outside in daylight and lower at night.
I’ve read online some people saying to let it cure on its own, others saying dehumidifier, others saying convection heater, so I’m a little all over the place at the moment.
I’m in no rush to move in so not fussed about speeding up the process. I want to know the best way to avoid cracks.
Do I just leave windows open over night and let it cure on its own?
Do I put in a couple of heaters?
Will the really low temperatures cause an issue? Or does the temperature not really cause a problem as long as it can dry out naturally?
All help is much appreciated .