Wow, it'll take 3 months for mine then as my screed is going to be 3 inches in depth with tiles over the top. Glad I saw this thread; came in handy for me too . Thank you.
could you explain how please i was led to believe that a dehumidifier would take the moisture content out of the room and therefore draw the moisture from the screed and unlike a heater not crack the floor or new plaster work could anyone explain where i am going wrong with this thought then please it would be much appreciated thanks and i'm fairly new at this so be gentle
Yes, it takes 1 day per mm, so allow 50 days - or 7 weeks - for a 50mm screed to be dry enough to overlay with impermeable coverings such as vinyl and carpet.
The easiest way to speed the process is to use a product called Uniscreed. There are 3 grades:
Uniscreed Standard (a liquid admix) will cut this drying time down to 8 days.
Uniscreed Rapid (a powder admix) will cut it down to 3 days.
Uniscreed FastDry (a cement replacement) will cut it down to 1 1/2 days.
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local