http://www.youtube.com/watch?v=rmgf60CI_ks
He writes, "Watch it with the sound switched on, it is sensational. To say nothing of having the carbon footprint of Texas."
This display was the work of Carson Williams from Ohio, electrical engineer who spent about three hours sequencing the 88 Light-O-Rama channels that controlled the 16,000 Christmas lights in his annual holiday lighting spectacular (from Christmas 2004). His 2005 display includes over 25,000 lights that he spent nearly two months and $10,000 to hook up. So that the Williams' neighbors aren't disturbed by constant noise, viewers driving by the house are informed by signs to tune in to a signal broadcast over a low-power FM radio station to hear the musical accompaniment.
He writes, "Watch it with the sound switched on, it is sensational. To say nothing of having the carbon footprint of Texas."
This display was the work of Carson Williams from Ohio, electrical engineer who spent about three hours sequencing the 88 Light-O-Rama channels that controlled the 16,000 Christmas lights in his annual holiday lighting spectacular (from Christmas 2004). His 2005 display includes over 25,000 lights that he spent nearly two months and $10,000 to hook up. So that the Williams' neighbors aren't disturbed by constant noise, viewers driving by the house are informed by signs to tune in to a signal broadcast over a low-power FM radio station to hear the musical accompaniment.