Just had a partial build loft conversion done ie all structural work which is now complete apart from the ensuite, i am putting a sink - toilet and shower cubicle (mixer from combi) in the ensuite, i have got one hot supply from the boiler and one cold pipe from the mains both feeds from the family bathroom directly below.
Do i need check valves on all the individual supplies to the sink - toilet - shower and if so do they need to be accessible as all the pipe work is in the floor voids / stud walls.
Any advice appreciated - thanks
Do i need check valves on all the individual supplies to the sink - toilet - shower and if so do they need to be accessible as all the pipe work is in the floor voids / stud walls.
Any advice appreciated - thanks