I have an existing utility room that I am doing some work in to make it more usable. Currently I have 40mm waste pipe work servicing the washing machine. The washer has a U bend at the end of the pipework.
What do I need to do here to be able to extend the pipe work around the room bay about 2.5M for a new sink?
Is it just a T piece or do I need to keep a U bend in after the feed on the washer section as well as the sink?
Thanks
What do I need to do here to be able to extend the pipe work around the room bay about 2.5M for a new sink?
Is it just a T piece or do I need to keep a U bend in after the feed on the washer section as well as the sink?
Thanks