I am currently in the process of building a forty foot pond in the shape of half a rectangle. The re-enforced concrete base is in, but my concern is whether to put an expansion joint in the concrete block work? As a brickie I know they should put in every 6metres and two of the longest sides are getting on for nearly ten metres. I don't want the blockwork cracking and cracking the render.
I am rendering the blockwork with sand cement and lime then sealing with G4 pond sealer.
[/b]
I am rendering the blockwork with sand cement and lime then sealing with G4 pond sealer.
[/b]