I'm looking to upgrade my vented system to an unvented system, and as part of that I'm looking to upgrade the 15mm pipe from the stopcock to 22mm.
We've got 25mm in to the house and the stopcock is in the downstairs loo, it's in the boxing in of the soil stack. The pipe run to the airing cupboard is complicated, and pretty long.
I'm thinking of running 22mm plastic pipe up the soil stack boxing, across the loft about 4m, and back down to the airing cupboard on the 1st floor. Is this a sensible idea?
Whilst at it, I'm thinking of running a second 22mm supply next to it for the cold water back down to the downstairs loo/utility/outside tap. I believe all cold water should be fed from after the pressure regulating valve next to the unvented cylinder?
I'm also toying with only running plastic on the vertical soil stack part, and copper across the loft just in case any pesky squirrels or mice get in there.
We've got 25mm in to the house and the stopcock is in the downstairs loo, it's in the boxing in of the soil stack. The pipe run to the airing cupboard is complicated, and pretty long.
I'm thinking of running 22mm plastic pipe up the soil stack boxing, across the loft about 4m, and back down to the airing cupboard on the 1st floor. Is this a sensible idea?
Whilst at it, I'm thinking of running a second 22mm supply next to it for the cold water back down to the downstairs loo/utility/outside tap. I believe all cold water should be fed from after the pressure regulating valve next to the unvented cylinder?
I'm also toying with only running plastic on the vertical soil stack part, and copper across the loft just in case any pesky squirrels or mice get in there.