- Joined
- 31 May 2018
- Messages
- 2
- Reaction score
- 0
- Country
Hi all just resigned up again after a long while off the forum . I have recently been helping my brother out a timber framed extension onto the rear of a bungalow. So here goes ! Bungalow has hipped roof . New ridge board ran through level with existinng. New roof to run through at existing pitch inline with old roof. Engineers drawing shows lay boards on old rear section rafters with diminishing rafters new to old . Old roof timbers are 100 mm and new are 150 we are worried about the height matching with the old . Hope this makes sense any feedback very gratefuly recieved.