Hey Team,
Recently moved into a new house and found a slightly weird setup I'd like some feedback on.
I have a pair of powered gates, 5 led lights and two external sockets at the front, these are all fed from a weather sealed consumer unit in what looks like a meter box embedded in the wall. No problem and it all works fine but I've just discovered its fed from two 2.5mm cables that arrive in a conduit into the cellar where they are both into a plug which is then connected to a socket.
I'm guessing this is a way of avoiding regulations as the electrical survey we had done states the external circuit is "Not within scope of test". Now, as I said its all working but I'm having some building works done that will make it impossible to access the socket so wondered if it should be wired in to the ring or taken to the consumer unit first? Not something I'll undertake, just need opinions so I can add it to the plan if needed.
Thanks!!
Recently moved into a new house and found a slightly weird setup I'd like some feedback on.
I have a pair of powered gates, 5 led lights and two external sockets at the front, these are all fed from a weather sealed consumer unit in what looks like a meter box embedded in the wall. No problem and it all works fine but I've just discovered its fed from two 2.5mm cables that arrive in a conduit into the cellar where they are both into a plug which is then connected to a socket.
I'm guessing this is a way of avoiding regulations as the electrical survey we had done states the external circuit is "Not within scope of test". Now, as I said its all working but I'm having some building works done that will make it impossible to access the socket so wondered if it should be wired in to the ring or taken to the consumer unit first? Not something I'll undertake, just need opinions so I can add it to the plan if needed.
Thanks!!