How did they prepair the brickwork/blockwork for doorways back in the 70's?
I have a house from that period and there appears to be a small hole in the floor just inside the doorway. Prodding down with a screwdriver seems to indicate it is very deep. This is directly below the skirting attached to the door brickwork return/reveal (not sure what it's called!)
Can anyone point me to an old drawing of a sectional view of what it may be like under and to the sides of the door threshold?
Eg. how does the floor screed 'bridge' the 'below DPC brick/blockwork?'
How would they have done it then?
I need to understand what I should do about this hole.
Thanks in advance.
I have a house from that period and there appears to be a small hole in the floor just inside the doorway. Prodding down with a screwdriver seems to indicate it is very deep. This is directly below the skirting attached to the door brickwork return/reveal (not sure what it's called!)
Can anyone point me to an old drawing of a sectional view of what it may be like under and to the sides of the door threshold?
Eg. how does the floor screed 'bridge' the 'below DPC brick/blockwork?'
How would they have done it then?
I need to understand what I should do about this hole.
Thanks in advance.