Morning all.
Just a quick one; we've had a couple of quotes for the installation of 2No. RSJ's to an external wall. This particular corner of the house is almost an L shape, with the RSJ's being inserted in the vertical part of the L. Presuming the length of this vertical part is 2300mm, how much brickwork will need to remain for the RSJ's to sit on?
Hope this makes sense. If not I can post an CAD drawing to make things more clear.
Edit to clarify: it'll be one opening, but two steels will be required as it's a cavity wall.
Just a quick one; we've had a couple of quotes for the installation of 2No. RSJ's to an external wall. This particular corner of the house is almost an L shape, with the RSJ's being inserted in the vertical part of the L. Presuming the length of this vertical part is 2300mm, how much brickwork will need to remain for the RSJ's to sit on?