Hi
I'm just starting work on a side extension which requires a 4.5m steel beam in place. Along with a few other quotes the steel price plus labour in £2500 using the pier option on this main big steel. If we go for the frame option and use steel columns to support the price shoots up to £5000. Is it really £2500 to install the columns over bricks? i know the steel columns themselves only cost £300 ish each so the rest must be labour charges.
Can anyone advise if this is resonable?
I'm just starting work on a side extension which requires a 4.5m steel beam in place. Along with a few other quotes the steel price plus labour in £2500 using the pier option on this main big steel. If we go for the frame option and use steel columns to support the price shoots up to £5000. Is it really £2500 to install the columns over bricks? i know the steel columns themselves only cost £300 ish each so the rest must be labour charges.