F2 vs Engineering for Below Ground to DPC

Joined
12 Mar 2019
Messages
257
Reaction score
20
Country
United Kingdom
Afternoon all!

Always assumed I was going to use engineering bricks upto the render level (Which'll be a course or two above DPC to match the existing house) but the selection is pretty weak and I'd like to soften the contrast with the old house, especially as they won't be tied in or matched by course.

So now I'm looking at F2 bricks - I'm just wondering if I'm missing anything by using these underground? Am I going to run into trouble?

I don't really want to have Brick 1 | Brick 2 | Render as it'll look a mish mash
 
Last edited:
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top