Afternoon all!
Always assumed I was going to use engineering bricks upto the render level (Which'll be a course or two above DPC to match the existing house) but the selection is pretty weak and I'd like to soften the contrast with the old house, especially as they won't be tied in or matched by course.
So now I'm looking at F2 bricks - I'm just wondering if I'm missing anything by using these underground? Am I going to run into trouble?
I don't really want to have Brick 1 | Brick 2 | Render as it'll look a mish mash
Always assumed I was going to use engineering bricks upto the render level (Which'll be a course or two above DPC to match the existing house) but the selection is pretty weak and I'd like to soften the contrast with the old house, especially as they won't be tied in or matched by course.
So now I'm looking at F2 bricks - I'm just wondering if I'm missing anything by using these underground? Am I going to run into trouble?
I don't really want to have Brick 1 | Brick 2 | Render as it'll look a mish mash