Hi all, Me and a builder friend are digging out a drain line and need some advice.
The inspection chamber is 1 meter in depth, I need to run the drain 7 meters from chamber, what should the fall be on this? How many cm below ground should the drain be at the 7 meter point?
Also i would like to in future take a drain line to my outbuilding, which is around 6 meters further than my extension plan. I dont what to take the drain there now but would like to have the drain line available outside of my extension for where i'm ready. please advise how i could do this too.
Many thanks in advance.
The inspection chamber is 1 meter in depth, I need to run the drain 7 meters from chamber, what should the fall be on this? How many cm below ground should the drain be at the 7 meter point?
Also i would like to in future take a drain line to my outbuilding, which is around 6 meters further than my extension plan. I dont what to take the drain there now but would like to have the drain line available outside of my extension for where i'm ready. please advise how i could do this too.
Many thanks in advance.