Hi all
I've just removed a couple of radiators in a ground floor extension and put in a new one in a different position. The floor had to be tracked to a depth of 5 or 6 inches. What I would like to know is what is the best method/mix for filling these holes?
Cheers
 
Sponsored Links
heeelllooo justy r

are you saying you have dug a channel in concretete to put the
pipes in and now need to fill it in

big all
 
Sand and cement ? Concrete ? Sounds fairly simple, am i missing something?
 
Sponsored Links
yes i know sand and cement/ concrete, what I was asking is what is the best mix (ie. ratio) for this job.
 
Ratio 4:1 Sharp sand/ Cement

Also best to protect the copper pipe from cement with denso tape, bitumen or insulation pipe etc........
 
Cheers masona,
Pipes are well protected with lagging, tape etc.
So you reckon just sand/ cement, no concrete then. The holes are roughly 4-5 inches deep.
 
justy_r said:
Pipes are well protected with lagging, tape etc.
So you reckon just sand/ cement, no concrete then. .
Yes, just sharp sand & cement. Damp the area with water or unibond if you wish
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top