- Joined
- 30 Sep 2004
- Messages
- 126
- Reaction score
- 1
- Country
To aid refilling the system without having to keep going outside to boiler, then back in to bleed, etc I want to add a pressure reducing valve to the filling loop.
I am wondering what sort of coupling would be needed - the PRV's I have seen are 15mm compression fittings. I am guessing one end of the filling loop would simply screw onto one end of the PRV. However, that leaves me with a threaded end of the PRV to connect to the threaded end of the filling valve.
Can anyone advise how to connect this up. Ideally I would like to be able to have the PRV connected to the filling loop such that it can be screwed into the existing filling outlet point.
Also, any advice on a PRV. Seems to be quite a range from around £20 to £50.
I am wondering what sort of coupling would be needed - the PRV's I have seen are 15mm compression fittings. I am guessing one end of the filling loop would simply screw onto one end of the PRV. However, that leaves me with a threaded end of the PRV to connect to the threaded end of the filling valve.
Can anyone advise how to connect this up. Ideally I would like to be able to have the PRV connected to the filling loop such that it can be screwed into the existing filling outlet point.
Also, any advice on a PRV. Seems to be quite a range from around £20 to £50.