Hi,
Just about to put a liquid DPM down on a concrete floor. However, there are a couple of small holes (about 4cm deep, 2 x 3cm width/length) in the concrete base.
I don't want to puddle any DPM into these holes but does anyone know the best way I can 'fill' them before putting down the DPM.
Any help would be appreciated.
Thanks,
Damian
Just about to put a liquid DPM down on a concrete floor. However, there are a couple of small holes (about 4cm deep, 2 x 3cm width/length) in the concrete base.
I don't want to puddle any DPM into these holes but does anyone know the best way I can 'fill' them before putting down the DPM.
Any help would be appreciated.
Thanks,
Damian