Hi there
I'd just like some advice on how to make sure once the footings are dug that the concrete will be level when pumped into the footings.
The hole will be 1.5m deep and the concrete will be 1.2m deep.
I have been advised to use a water level kit.
1) I should get a steak and dig it into the bottom of the footings. The steak must be at least 2m long.
2) Dig the steaks at either end of the footings at least 50cm deep so that it is secure.
3) Measure 1.2m from the base to the top and mark it off.
4) Use the water level kit at either end of the footings.
5) Once I've used the water kit then I should get some string and use that as a level.
Is this correct? Can someone advise me (without being too patronising!!) as this is the first time I'm going to do this. Should I be using lots of steaks?
Thank you in advanced for your help.
I'd just like some advice on how to make sure once the footings are dug that the concrete will be level when pumped into the footings.
The hole will be 1.5m deep and the concrete will be 1.2m deep.
I have been advised to use a water level kit.
1) I should get a steak and dig it into the bottom of the footings. The steak must be at least 2m long.
2) Dig the steaks at either end of the footings at least 50cm deep so that it is secure.
3) Measure 1.2m from the base to the top and mark it off.
4) Use the water level kit at either end of the footings.
5) Once I've used the water kit then I should get some string and use that as a level.
Is this correct? Can someone advise me (without being too patronising!!) as this is the first time I'm going to do this. Should I be using lots of steaks?
Thank you in advanced for your help.