The finished floor level on my new extension is lower than my existing house. To cut a long story short, I need to lower the f/f/l of the old floor, which is concreted.
I will have to remove the concrete, probably go down a lot lower, and put in insulation,dpc membrane, and re-screed.
Any ideas on doing it efficiently?
should I use a kango drill to remove the concrete, or a concrete saw? I do not want to cause damage to the house...
I will have to remove the concrete, probably go down a lot lower, and put in insulation,dpc membrane, and re-screed.
Any ideas on doing it efficiently?
should I use a kango drill to remove the concrete, or a concrete saw? I do not want to cause damage to the house...