I am confused: for a dwelling where the construction started in 2006, the ceiling on a garage, with a bedroom above (joists floor) does it need 30 min or 60 min fire protection according to the regs. There is mineral wool between joists.
Another thing, why use the expensive Fermacell, when it would need two layers of 15mm board if it is 60 mins? Is it not better just to use the cheaper Fireline?
Another thing, why use the expensive Fermacell, when it would need two layers of 15mm board if it is 60 mins? Is it not better just to use the cheaper Fireline?