Hi,
Just looking for some advice here on a DIY project I am starting in a few weeks time. Basically I am going to cut into the existing CH loop (combi bolier) to add this heated towel rail as the old one was electric. So I got a plan to run the 15mm supply and return into the bathroom and cut a channel up the wall so that the pipework will come out of wall at about 800mm above the floor level and then connect to the towel rail. I know that you need to fix the rad to the wall first so that it is easier to line up the pipework. The problem is I am going to be tiling the wall afterwards and I will need to fit the towel rail on top of the tilework. Any tips & tricks on this would be appreciated i.e how to cut tiles, anticipationg the tile thick ness & how to make my intial pipework adjustable
thanks
Adam
Just looking for some advice here on a DIY project I am starting in a few weeks time. Basically I am going to cut into the existing CH loop (combi bolier) to add this heated towel rail as the old one was electric. So I got a plan to run the 15mm supply and return into the bathroom and cut a channel up the wall so that the pipework will come out of wall at about 800mm above the floor level and then connect to the towel rail. I know that you need to fix the rad to the wall first so that it is easier to line up the pipework. The problem is I am going to be tiling the wall afterwards and I will need to fit the towel rail on top of the tilework. Any tips & tricks on this would be appreciated i.e how to cut tiles, anticipationg the tile thick ness & how to make my intial pipework adjustable
thanks
Adam