So I'll be using the 15mm copper but wanted to know which size drill bit to use?
It has to pass through a layer or two of brick (cupboard on the other side where the connection will be made to the existing system).
Drilling through tile obviously so I was thinking of using this to help the drill be steady:
http://www.screwfix.com/p/erbauer-diamond-tile-drill-guide/84524
Or some masking tape might do the trick I suppose.
Once through the tile I was going to use a 16mm masonry bit but will this give me enough leeway to comfortably get the 15mm copper pipe through the wall or should I upsize it a little more?
Thanks in advance plumbs.
It has to pass through a layer or two of brick (cupboard on the other side where the connection will be made to the existing system).
Drilling through tile obviously so I was thinking of using this to help the drill be steady:
http://www.screwfix.com/p/erbauer-diamond-tile-drill-guide/84524
Or some masking tape might do the trick I suppose.
Once through the tile I was going to use a 16mm masonry bit but will this give me enough leeway to comfortably get the 15mm copper pipe through the wall or should I upsize it a little more?
Thanks in advance plumbs.