Sorry if this is the wrong forum.
It was a quick question about a job price (or length) I had a plumber round the other day to quote for a job. I need 3 rad valves replaced (rads are fine, pipework is fine) and one 2 port valve in the airing cupboard replaced. The system will be already drained.
He said it would be most of a day and therefore would be a whole day rate. We had a plumber a while back who fitted a downstairs cloakroom including installing a rad into it where there wasn't one previously, and he did the rad (plus new pipework, brackets etc) in about 2 hours
Could anyone let me know what a reasonable cost or timescale for replacing 3 rad and one 2 port valve (with an empty system)
I won't put my location so nobody thinks I am trying to find a plumber (don't know if that is allowed on here), I just don't want to be ripped off (especially as once he was there, the guy told me he would be able to get his brother round to do it)
Thanks
It was a quick question about a job price (or length) I had a plumber round the other day to quote for a job. I need 3 rad valves replaced (rads are fine, pipework is fine) and one 2 port valve in the airing cupboard replaced. The system will be already drained.
He said it would be most of a day and therefore would be a whole day rate. We had a plumber a while back who fitted a downstairs cloakroom including installing a rad into it where there wasn't one previously, and he did the rad (plus new pipework, brackets etc) in about 2 hours
Could anyone let me know what a reasonable cost or timescale for replacing 3 rad and one 2 port valve (with an empty system)
I won't put my location so nobody thinks I am trying to find a plumber (don't know if that is allowed on here), I just don't want to be ripped off (especially as once he was there, the guy told me he would be able to get his brother round to do it)
Thanks