Started to fit a concealed shower, with fixed head into our new bathroom in a recently completed loft conversion. No problems with the shower, as you can work on this from the front tile around and put the face plate on last. Same with the the fixed head, leave pipe out of the wall, tile around and use the fixing bolt after.
My problem is with the body massage jets, they need to be tigthened up from behind but after tiling ! I don't have access to the other side on the wall only from the front. Any ideas?
If it makes a difference, its all Hudson Reed equipment.
My problem is with the body massage jets, they need to be tigthened up from behind but after tiling ! I don't have access to the other side on the wall only from the front. Any ideas?
If it makes a difference, its all Hudson Reed equipment.