hi,
heres a pic of where my new roof meets the house,
the tiles are not fitted yet, i just put a few on to see what it would look like,
just wondering about my flashing,
i've got code 4 300mm lead,
should it go under or over the tiles?
i was thinking chase it into the wall then take it down to the truss level then back up onto the battens (to form a little gutter about 10mm wide) and then under the tiles,
cheers,
neil
heres a pic of where my new roof meets the house,
the tiles are not fitted yet, i just put a few on to see what it would look like,
just wondering about my flashing,
i've got code 4 300mm lead,
should it go under or over the tiles?
i was thinking chase it into the wall then take it down to the truss level then back up onto the battens (to form a little gutter about 10mm wide) and then under the tiles,
cheers,
neil